Recent and ongoing projects

Assessment of the impact and status of the updated design of the main pipeline connecting construction lots LPI5 and LPI3 of the Sanitary Sewerage Project System 3 - Phases 2 and 3 in Guayaquil

Client: French Development Agency (AFD)

Mission:

The mission consisted of reviewing and going through on the ground the routes of the updated plans of the main collector connecting the building lots LPI5 and LPI3, which makes it possible to identify whether these routes have social and/or economic implications for the inhabitants of the sector.

Results:

The following deliverables were provided to the client:

  • Mission Schedule
  • Preliminary report
  • Final report
  • Updated impact map